Step-by-step instructions guide installation of the conveyor assembly and panels for the HydraFiber Processing Unit after final placement and leg installation. The sequence covers lifting and positioning the stacked conveyors, securing them with L-brackets and labeled legs, and making final height and angle adjustments using base mounts and a pallet jack. It then details installing bale guide and side panels in alphabetical order, adding the lower conveyor drive motor, upper conveyor drive chain, and bale sensor, and connecting sensor wiring before reinstalling all guards and fastening doors.
Key Points
- Uses common tools including wrenches, ratchets, a crane or forklift, folding ladder, ratcheting strap, and high-lift pallet jack to aid conveyor installation.
- Specifies orienting the machine facing the soil infeed side and inserting the conveyor until it contacts the “L” and “R” panels before securing L-brackets.
- Requires positioning labeled legs, gussets, and base mounts under conveyor leg brackets to maintain a level installation and proper height.
- Directs installers to add labeled bale guide and side panels in ascending alphabetical order, then install the drive motor, drive chain, bale sensor, wiring, guards, and doors.
